AECC delivered the Nimar substation in Riyadh as a ten-bay indoor GIS facility rated 132/13.8kV, supplying three power transformers rated 67 MVA and 44 circuit breakers of 13.8kV switchgear. The scope included three 7 MVAR capacitor banks, the foundation and civil works, protection, control, SCADA and telecommunications systems, with testing and commissioning completed before energisation.