Loading

AECC delivered the Al-Zahra-2 substation in Makkah as a nine-bay indoor GIS facility rated 110/13.8kV, supplying three power transformers rated 54/73 MVA and two auxiliary transformers. The scope included 49 circuit breakers of 13.8kV switchgear, three 7 MVAR capacitor banks, protection, control, SCADA and telecommunications systems, and the civil and mechanical works needed to bring the station into service.