The Al-Watania substation project in Al Qassim added two 132kV power transformers and 29 panels of 33kV switchgear to the network, along with a STATCOM for dynamic reactive power compensation. AECC's scope spanned protection, control and telecommunications systems, a full substation automation system, and the civil works, installation, testing and commissioning needed to bring the station into service.