Loading

The Al Falah substation in Riyadh was delivered by AECC as a ten-bay indoor GIS facility rated 132/13.8kV, built around three power transformers rated 67 MVA and 44 circuit breakers of 13.8kV switchgear. Scope of work covered three 7 MVAR capacitor banks, protection, control, SCADA and telecommunications systems, and the civil and mechanical works, testing and commissioning.