The Wali Al Ahad substation in Makkah was delivered by AECC as a nine-bay indoor GIS facility rated 110/13.8kV, built around three power transformers rated 50/67 MVA and 34 circuit breakers of 13.8kV switchgear. Scope of work included three 7 MVAR capacitor banks, protection, control, SCADA and telecommunications systems, and the civil and mechanical works, testing and commissioning.