Loading

Following fire damage at substation 8014 in Riyadh, AECC carried out the full rehabilitation as main EPC contractor, beginning with a damage assessment and engineering review. The scope covered procurement and delivery of replacement equipment and materials, protection, control, SCADA and telecommunications systems, and the civil and mechanical reconstruction works needed to restore the 132/13.8kV substation, concluding with testing and re-commissioning.