Loading

AECC installed the underground high-voltage cable link between Qatif and Tarut substations for Saudi Energy, covering two routes totalling roughly 23.7 kilometres. The works included trenching and duct-bank civil construction, cable laying, pulling and jointing, and fibre-optic duct installation alongside the power cables, concluding with testing and commissioning of the completed link.