Loading

AECC built two new 110kV double-circuit overhead transmission lines spanning approximately 2.95 kilometres to connect the New Badr substation into the grid. The towers use single-peak latticed steel structures carrying a doubled 500 square millimetre AAAC conductor per phase, with the line tested and commissioned before energisation.