Loading

AECC executed a 13.8kV medium-voltage substation for Aramco in Jeddah, centred on a 2.5/3.15 MVA oil-immersed power transformer and power system automation. Work included the low-voltage switchgear and motor control centre, a dry-type auxiliary transformer, MV, LV and multi-core control cabling, and the grounding, lightning protection and lighting systems, with testing and commissioning carried out before handover.

