Loading

For Aramco's SPARK in Abqaiq, AECC delivered a 13.8kV medium-voltage substation built around an oil-immersed power transformer rated 2.5/3.15 MVA and a full suite of low-voltage switchgear, including ERMS, ATS and a motor control centre. The scope included power system automation, a dry-type auxiliary transformer, MV and LV control cabling with termination, and the grounding grid, lightning protection and lighting systems, closing with full testing and commissioning.

