AECC delivered a new 115kV gas-insulated switchgear substation for Maaden at Ras Al-Khair, built around a nine-bay 115kV GIS yard and two 132/34.5kV power transformers rated 60/75 MVA. The scope extended to a 21-panel 34.5kV GIS switchgear installation, full protection, power management and telecommunications systems, and the supporting MEP, HVAC, fire alarm and fire-fighting infrastructure. Two new 115kV underground cable circuits were laid along a 3.3 kilometre route to connect the substation into the network.